GLOBAL-TOOL-13 · INCIDENT EVIDENCE

Incident Evidence & As-left Handover Checklist

Use one incident identity to connect the as-found state, raw evidence, safe work boundary, bounded verification, decision and actual as-left handover.

Use boundary

This form does not replace a permit, risk assessment, energy-control procedure, statutory inspection, OEM instruction, qualified-person decision or restart authorization.

Entries are not transmitted.

Values are saved only in this browser. Clear them before leaving a shared device. Do not enter personal contact, payment, credential or security-sensitive data.

Blank PDF한국어 서식Local autosave ready
01

IDENTIFY & PRESERVE

Incident, asset and as-found state

02

RAW EVIDENCE REGISTER

Source, condition, timestamp and custody

Evidence ID / sourceAsset / point / locationAs-found conditionTime quality / event windowOriginal file / hash / custodian
03

CONTROL THE BOUNDARY

People, area, energy, permits and stop conditions

Energy / hazardSource and isolation pointStored / backfeed / automatic startControl and verificationOwner / affected people

Stop and hold the decision

04

BOUNDED VERIFICATION

One hypothesis, one approved difference, one evidence result

Hypothesis / questionApplicable basis / revisionInitial state / prerequisiteApproved action / expected resultStop / rollback / evidence

Do not invent a universal pass value. Record the exact law, standard, design, procedure, OEM document or site criterion, its revision, its application conditions and the named reviewer.

05

DECISION & RECOVERY

Hold, limited test, staged return or release

Gate / scopeRequired evidenceActual result / evidence IDDecisionAuthority / time
Safe boundary
Functional verification
Staged operation
Incident evidence path from preserve and control through bounded verification, decision and as-left handover
Explanatory record structure only. It does not authorize work, energization, bypass, restart or release.
06

AS-LEFT HANDOVER

Transfer the actual state, limitations and ownership

Configuration

Temporary and open items

Operating ownership

Official source boundaries

These sources do not create a universal acceptance value or site authorization. Confirm country, AHJ, site procedures, applicable standards, permits, qualified roles, exact equipment and software revision, OEM instructions and responsible authority.